Chennai, the capital city of Tamil Nadu, is gearing up to tackle the peak power demand in the state with a groundbreaking initiative. The Tamil Nadu Generation and Distribution Corporation (TANGEDCO) is set to install six massive batteries with a total capacity of 0.5 gigawatt-hours over the next two years. These batteries will be used to store renewable energy generated from sources like solar and wind power to ensure a stable power supply during peak demand periods. This move is part of the state’s efforts to increase reliance on renewable energy and reduce carbon emissions. The installation of these batteries is expected to significantly improve the state’s grid stability and reduce its dependence on conventional power sources. With this initiative, Tamil Nadu is taking a giant leap towards a greener and more sustainable future. Stay tuned for more updates on this innovative project.
Posted in
JUST IN
Tamil Nadu to install five massive batteries to address peak power demand in two years.
In Trend
“Retiree falls victim to 6.5 crore cyber scam in Chennai, highlights online fraud risks”
